Carrying Out The Zero Adjustment; Carrying Out The Span Calibration - Dräger Polytron 6100 EC WL Instrucciones De Uso

Ocultar thumbs Ver también para Polytron 6100 EC WL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

en
Calibration

10.4 Carrying out the zero adjustment

Prerequisites:
– Warm-up phase of the sensor complete
– The test gas supply has been prepared.
– A connection between the gas detector and PolySoft has
been established.
Carrying out the zero adjustment:
1. Start the zero adjustment in PolySoft.
 The ISA100 Wireless
"Measured value invalid."
2. Follow the instructions of the wizard in PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the zero point adjustment, switch off
the gas flow and remove the calibration adapter.

10.5 Carrying out the span calibration

Prerequisites:
– Zero point adjustment has been carried out.
– The test gas supply has been prepared.
– A connection between the gas detector and PolySoft has
been established.
Carrying out the span calibration:
1. Start and confirm the span calibration in PolySoft.
 The ISA100 Wireless
"Measured value invalid."
2. Follow the instructions of the wizard in PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the span calibration, switch off the gas
flow and remove the calibration adapter.
interface transmits the status
interface transmits the status
Dräger Polytron 6100 EC WL, Dräger Polytron Repeater ISA

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Polytron repeater isa

Tabla de contenido