Preparing Unit For Operation - Stihl SG 31 Manual De Instrucciones

Ocultar thumbs Ver también para SG 31:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
Spray Gun
Unlocking / locking spray gun
1
2
Push locking lever (1) upwards – the
N
trigger (2) is unlocked and can be
operated.
10
1
2
Push the locking lever (1)
N
downwards – the trigger (2) is
locked to reduce the risk of
accidental operation.

Preparing Unit for Operation

Visual Inspection
Do not operate your unit if any of its
components are damaged. It is
particularly important to check the
solution container and hose connections
for leaks.
Checking for Leaks
Carry out test with empty container.
1
Pressurize the solution container –
N
move the unlocked pump handle (1)
up and down several times until
piston manometer (2) shows a
pressure of 2 bar (29.0 PSI).
2
SG 31

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido