Tripp-Lite SmartOnline S3M10K1B Manual Del Propietário página 21

Sistemas ups trifásicos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installation and Wiring
6. Working from the bottom up, install 10 batteries on the first and second shelves on the left side of the unit. Always keep
the terminal side of all batteries facing up.
Figure 3-11: Install batteries on the first and second shelves on the left side.
7. Reattach the six battery bracket bars removed in step 3 (Figure 3-12).
Figure 3-12: Reattach Battery Bracket Bars
21

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido