For vehicles with OEM Tow Hook: Tow hook must be permanently removed for hitch
installation
1. Remove (4) existing M14 bolts (Do Not clean the threads). Retain bolt for reinstallation.
2. Raise hitch into position as shown and install fasteners as shown. If excess caulking on the
frame rail interferes with hitch installation lower hitch and scrape excess caulking for installation.
3. Tighten all fasteners to called-out torque specification
Tighten all M14 fasteners with torque wrench to 115 Lb.-Ft. (156 N*M)
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
Resumen de contenidos para Cequent Performance Products 75699
Página 1
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5 and SAE J684. Sheet 1 of 3 75699N 1-24-14 Rev. C 2010, 2014 Cequent Performance Products – Printed in Mexico Form: F205 Rev A 5-6-05...
Página 2
Ce produit est conforme aux normes V-5 et SAE J684 de la V.E.S.C. (État de New York) concernant les spécifications en matière de sécurité des systèmes d’attelage. Feuille 2 de 3 75699N 1-24-14 Rev. C 2010, 2014 Cequent Performance Products – Imprimé au Mexique Form: F205 Rev A 5-6-05...
Página 3
Este producto cumple con las especificaciones y requisitos de seguridad para conectar dispositivos y sistemas de remolque del estado de Nueva York. V.E.S.C. Regulación V-5 y SAE J684 2010, 2014 Cequent Performance Products – Hoja 3 de 3 75699N 1-24-14 Rev.