EN
12
ASSEMBLY
1. Assemble Legs (E) to Main Body (D) with 6pcs-M6 x 15 Bolts (F) and Nuts (G).
2. Assemble Bottom Funnel (C) to Main Body (D) with 3pcs- M6 x 15 Bolts (F)
and Nuts (G).
3. Assemble Top Funnel (B) to Bottom Funnel ( C) with 3pcs- M6 x 15 Bolts
(F) and Nuts (G).
4. Put Rain Lid (A) on Top Funnel (B).Now check and tighten all fixings,
assembly is complete.