Important; Pre-Installation Information - Bradley S19-292 Manual De Instrucciones

Ocultar thumbs Ver también para S19-292:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-292, S19-292PT
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
T H
E
S ID
until you obtain the missing parts.
U P
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be "ON" at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation/installation of this product, visit bradleycorp.com
or call 800.BRADLEY (800.272.3539).
Product warranties may also be found under "Products" at bradleycorp.com.
Supplies Required:
• ½" NPT water supply to inlet on unit
• Bolts for cabinet mounting
• Pipe sealant
• Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation.
Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify
that it is functioning properly. Backflow prevention valves are not included with the fixture and may be
supplied by the contractor or purchased from Bradley Corporation.
2

IMPORTANT

9/20/10
Bradley Corporation • 215-1598 Rev. D; ECM 10-05-031
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-292pt

Tabla de contenido