3. Check the water lever, and fill the cooled-water full.
4. Check the fan strap's degree of tightness
5. Set the main switch to OFF.
6. Turn the engine start key to START position.
7. Warm-up time is about 3-5 minutes.
8. Speed controller has adjusted well before transporting. So don't adjust it at random, or it will
cause the engine rotation speed too high or too low.
9. The battery is optional for generator, to install right battery according with the generator before
start.
5. STARTING-UP & RUNNING PROCEDURE
1. According to the step of 1-10, finish the starting-up procedure.
2. Ensure voltmeter indicates normal, (single phase: 230V, three phase: 380V)
3. Set the main switch to ON.
4. Observe the voltage is in the normal loaded range.
5. Preheat generator three minute without load after the set starting, then running with load
6. The new generator set have a running-in period, the period is the initial 20
hours, only with 50% load during the running-in period, or it will shorten the set life.
7. Checks during the running
1) Whether there is abnormal sound or vibration;
2) Whether the engine misfires or runs rough;
3) Check the color of the exhaust. (Is it black or too white?)
If you notice any of the above-mentioned phenomenon happened, stop the engine
and find out the fault cause or contact with our agents.
If the engine has been running, the muffler will be very hot. Be careful not to touch the
muffler.
The diesel is adopted in the explosive motor. Never fill the diesel which is inflammable
when the generator is working. Be careful to fill fuel and prevent fuel overflowing. Wipe up
the overflowing fuel immediately. Flame and fire are forbidden near the generator.
8. Load
Do not start 2 or more machines simultaneously. Start them one by one.
11