Kohler K-18829 Guía De Instalación Y Cuidado página 9

Ocultar thumbs Ver también para K-18829:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lag Bolts
4. Install the Carriage
Align the carriage flush with the front edge of the studs. The
front of the carriage must be flush with the front edge of the
studs or set back slightly to allow finished wall installation.
Verify that the front of the carriage is plumb.
Mark the hole locations for the six lag bolts, one for each foot and
two on each side of the carriage.
Drill pilot holes (remove the carriage if needed) at the marked
locations.
NOTE: If you install the carriage onto a concrete subfloor, use
concrete expansion bolts (not supplied) when securing the feet of
the carriage.
Secure the carriage to the support studs using 3/8" x 2" (51 mm)
long (minimum) lag bolts (not supplied), one at each location.
Connect the Power - Cleansing Seat Installations
WARNING: Risk of personal injury. Disconnect the
electrical power before connecting the wires.
Kohler Co.
9
1246750-2-C

Publicidad

Tabla de contenido
loading

Tabla de contenido