Descargar Imprimir esta página

Electrical Installation; Sensor Connections; M12 Socket I1/2 (Espe Connection); Tab. 3: Pin Assignment Socket I1/2 - SICK UE4215 Manual De Instrucciones

Ocultar thumbs Ver también para UE4215:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Operating Instructions
UE4215
5

Electrical installation

WARNING
Fig. 3: Circuit diagram for the
UE4215 and pin assignments
for the M12 socket for the
connection of the ESPE
Tab. 3: Pin assignment
socket I1/2
8010654/TF83/2010-07-20
Subject to change without notice
Electrical installation
5.1

Sensor connections

Switch the entire machine/system off line!
While you are connecting the safe bus node UE4215 or connecting other devices, the
machine may start unintentionally.
Ensure that the entire machine/system is disconnected during the electrical installation.
Do not connect the inputs to an external potential!
Ensure that external potential is not applied to the inputs on the safe bus node UE4215,
as otherwise correct function cannot be ensured.
Always cover AUX PWR socket when it is not in use!
Always cover the AUX PWR socket with the enclosed sealing cap if it is not used, as
otherwise the IP 67 enclosure rating will not be achieved.
5.1.1

M12 socket I1/2 (ESPE connection)

Connect the sensor to the socket.
Pin 2
Pin 1
Pin 5
Pin
Wire colour
1
Brown
2
White
3
Blue
4
Black
5
Grey
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
Function
AUX L+ (24 V)
I2, Input for OSSD2
AUX L–
I1, Input for OSSD1
Functional earth (FE)
GB
Chapter 5
Pin 3
Pin 4
95

Publicidad

loading