Adjusting Roll Groove Depth - RIDGID 916 Roll Groover Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

916 Roll Groover
Figure 8A – Operating Machine in REVERSE (REV)
Position
Figure 8B – Operating Machine in FORWARD (FOR)
Position

Adjusting Roll Groove Depth

NOTE! To obtain the proper groove diameter, a test
groove should be performed when setting up or
changing pipe sizes.
1. Lift feed handle upward. (Figure 9)
Figure 9 – Feed Handle in UP Position
2. Fully loosen depth adjustment screw.
Figure 10 – Loosen Depth Adjustment Screw
3. Tighten down depth adjustment screw the number of
turns indicated in Chart B. (Figure 11)
NOTE! Chart B indicates adjustment needed when using
the 916's standard roll set. See Chart D on Page 12
for special note on 1
pipe grooving. Chart C is used when grooving
copper.
Figure 11 – Tighten Depth Adjustment Screw
Ridge Tool Company
(Figure 10)
1
/
, 1
1
/
AWWA grooving and 1"
4
2
9

Publicidad

Tabla de contenido
loading

Tabla de contenido