Cequent Performance Products 66151 Instrucciones De Instalación página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Fig. 5
FRAME BRACKET ASSEMBLY (1200 lb and 1500 lb kits only, shown in Fig. 5)
•Assemble 5/8" bolt (V) through the top holes of the outside frame bracket (T) and inside frame
bracket (U) shown in Fig. 5.
•Slide bracket assembly over the trailer frame and install two 5/8" bolts through the highest bolt
holes that are unobstructed by the bottom of the frame. Frame brackets have 3 sets of mounting
holes to be used for 4", 5" and 6" frames.
•Install three 5/8" nuts (AB) and hand tighten.
•Slide frame brackets into position, the center of the frame brackets should be placed as shown in
Fig. 6. See Chart 1 on page 4 for dimension specification.
•Insert shoulder bolt (Y) through the pad hanger (M) and the hole in the outside frame bracket (T)
which allows the proper height shown in Fig. 8.
NOTE: During spring bar setup, it may be necessary to use a lower bracket hole to decrease
spring bar load if there is not enough head angle adjustment (See Fig. 8).
•Assemble 5/8" nut to the shoulder bolt clamping the pad hanger to the outside frame bracket.
•Torque all 5/8" nuts to 120 ft*lbs.
•Repeat for the other side.
FOR TRAILERS WITH A BOTTOM
MOUNTED/INVERTED COUPLER: Use the
lower pad hanger mounting holes in the outside
frame brackets and adjust the ball mount angle to
achieve the proper height before loading the spring
bars (See. Fig. 8).
3
66151IN-04302014 REV G
PCN3552
©2014 CEQUENT PERFORMANCE PRODUCTS, INC.
PRINTED IN MEXICO

Publicidad