Cequent Performance Products 66151 Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

UNHITCHING
•Block trailer wheels front and rear.
•Raise tongue of trailer with tongue jack as high as possible.
•Remove spring clip from pad hanger cover and swing cover down.
•If spring bar is still loaded on pad hanger, use of the lift handle will be required.
WARNING: To avoid serious injury, always stand to the side of the lift handle. Never stand
at the end of the handle or allow any part of your body under the handle.
•Place pivot pin of lift handle in the pad hanger pocket with spring bar in curved area of lift
handle. Lower lift handle and spring bar should pivot off of the pad hanger.
•Swing spring bars away from pad hanger and remove from head.
•Repeat for the other side.
•Lower the tongue of the trailer until the jack is off the ground and unlatch the trailer coupler.
Once unlatched, the trailer may be raised again to clear the top of the ball and vehicle can be
driven away.
LUBRICATION
•Lubricate the ball mount sockets, hitch ball, and spring bar trunnions to prevent unnecessary
wear. Trunnions should be lubricated daily when in use with heavy oil or grease. Lubricate
upper and lower trunnion pivot pins and the contact area in the ball mount sockets. Excess oil
and dirt should be wiped out whenever the trailer is uncoupled.
7
66151IN-04302014 REV G
PCN3552
©2014 CEQUENT PERFORMANCE PRODUCTS, INC.
PRINTED IN MEXICO

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

661536615566157

Tabla de contenido