Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

step 1

IMPORTANT

- The surface on which the track system is installed must be sturdy enough to
withstand the weight of all the panels in the stacking area.
- Verify type of ceiling fi xing point and how it could affect the structure.
- Do not install on fake ceiling.
- Verify that the fl oor is leveled in order to avoid subsequent problems with the
movement and panel stacking.
- Set up the track system on the fl oor before installing on the ceiling, having the
carriers already mounted. Remember to place in each track joint (Full Track or Half
Track) a track pin in the lower circular channel (fi g. 4), tightly inserting the striated
side fi rst.
- On the upper part, assemble the right bracket (fi g. 5), leaving half of it on each side,
and fi xing the position with the setscrews.
40
Track set-up according to stacking type
FIG. 5
FIG. 4
FIG. 5
FIG. 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sigma md oc

Tabla de contenido