A.
Fix Full Track 100mm to the structure.
B. Drill Full Track with ø 6mm drill bit, according with
measurement indicated in the drawing.
Then, install Sigma Stopper.
A
Introduce the carriers in the track
!
structure set up, as shown in the drawing,
paying attention to the indicated position
for each one of them.
1
1
46
2
1
2
2
1
2
B
ø6.0
35
!