Tools And Materials; Before You Begin - Kohler K-1107 Guia De Instalacion

Ocultar thumbs Ver también para K-1107:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Tape
Safety
Measure
Glasses
Claw
Hammer
Drill / Drill Bits
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before
you start installation. If you encounter any installation or performance problems, please don't hesitate to
contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler
Company.

Before You Begin

Observe all local plumbing and building codes.
Unpack and inspect the bath for damage. Return the bath to the carton until you are ready to
install.
This bath is designed for alcove installation. Models K-1145-F, K-1155-F and K-1245-F are designed
for corner installation.
Provide properly dimensioned framing.
Install the bath to an adequately supported, level subfloor.
The basin area requires no additional support when the subfloor is level and square with the stud
framing. Consider using shims for additional support if the subfloor is uneven.
Before installation, ensure proper access to the final plumbing connections.
Verify adequate mounting and connection space for the faucet.
Confirm adequate support for the faucet. Large deck-mounted faucets that may be inadvertently
used as a means of support are not appropriate or safe for this installation.
This bath conforms to ANSI Standard Z124.1. All dimensions are nominal.
Illustrations shown may not represent your actual product.
1016757-2-C
Pencil
Level
Knife
Square
Plus:
Sealant
#6 Large-head galvanized nails
Conventional woodworking tools and materials
Drop cloth
Construction adhesive (optional)
Cement or mortar (optional)
2x4's or 2x6's
Water-resistant wall material
Rag
2
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido