Putting The Device Into Operation - geberit AquaClean Tuma Comfort Instructions De Montage

Ocultar thumbs Ver también para AquaClean Tuma Comfort:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
EN
Commissioning

Putting the device into operation

Prerequisite
– The function tests were performed successfully.
– The device is installed correctly.
1
Remove the spray shield.
2
Clean the device.
3
Close the WC seat and WC lid.
4
Mount the design cover.
26
1
2
5
Remove the protective foil from the design
cover.
Result
ü The device is ready for operation and can be
handed over to the customer.
18014400418479371-1 © 05-2017
967.305.00.0 (01)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rg503000

Tabla de contenido