INSTALLATION INSTRUCTIONS FOR MULTIPLE UNITS (cont.)
BRACKETS
Locate Anti-tip brackets for all units.
the outside).
Mark (within slots, placement) stud and anchor
positions on brackets.
Secure brackets using a combination of studs &
anchors.
At least 1 stud must be engaged per unit. However,
please engage as many studs as possible within the
enclosure. A minimum of three fasteners per bracket
should be used for proper installation.
Slot
31-1000169 Rev. 4
Installation Instructions
80" (203.2 cm)
STEP 9 CONNECT WATER LINE
Connect to potable water supply
WARNING
only.
Locate and bring tubing to the front of the cabinets.
Turn the water on to flush debris from line. Run about
shut off water.
If needed cut the tubing to the proper length so it can
be attached to the water valve.
Copper Tubing:
copper tubing. Insert tube into the union fitting on the
unit and tighten nut to union.
Turn on the water to check for leaks.
SmartConnect™ Tubing:
Follow the instructions provided with the tubing. Over
tightening may cause leaks. Turn on the water to
check for leaks.
NOTE: Coil excess tubing length behind the unit.
STEP 10 CONNECT POWER
Plug the power cord into the socket.
Check to make sure power to unit is on by opening
the ice drawer (drawer will be taped shut) to see if
interior lights are on.
The temperature controls are preset at 37°F for the
refrigerator section and 0°F in both the freezer drawer
and customizable drawer.
Allow 24 hours to stabilize before making
adjustments.
Reapply tape to lower ice drawer.
27
Water
Line Hole