Valve Inlet
Supply
Nut
Tube
Supply
Stop
4. Supply Installation
NOTE: If the sink is not installed, install it at this time. Be sure to
follow all instructions packed with the sink.
For ground joint connections:
Slip the nut onto the supply tube.
Position the round end of the supply tube squarely to the valve
inlet and supply stop.
Securely tighten all nuts.
5. Installation Checkout
Ensure that both faucet handles are turned off. Hot is clockwise
close and cold is counterclockwise close.
Turn on the hot and cold water supplies.
Check for leaks.
Remove the aerator by turning it counterclockwise.
Turn on the hot and cold faucet handles for one minute to flush
debris from the faucet.
Close the hot and cold water handles.
Reattach the aerator by turning it clockwise until hand tight.
111056-2-BB
Aerator
6
Kohler Co.