Installing The Base (B3) - MAAX Utile Guia De Instalacion

Ocultar thumbs Ver también para Utile:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2
Installing the base (cont'd)
STEP
B3
Lift the base. Place cement or wood shims under all legs to
support the shower base floor. Lower the shower base and
validate leveling and stability of the base on the floor. If needed,
use additional wood shims or cement.
We recommend that a plumber completes the drain pipe
connection.
If needed use wooden shims between the studs and
the fastening flange to maintain the position of the
base.
FOR B3 BASES YOU MAY USE SHIMS UNDER
THE BASE TO LEVEL (UNDER THE BASE LEGS
IDEALLY)
With a 1/8" bit, drill holes in the fastening flange then
secure the base to all the wall studs with #8 x 1¾ "
screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE
HAVE TO BE AT LEAST 8MM (3/8") ABOVE THE
BASE THRESHOLD! HOLES MUST BE FILLED WITH
SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
All manuals and user guides at all-guides.com
Leveling the base is critical
for wall alignment
COMPATIBLE BASES
B3 Square 4832
B3 Round 4832
B3 Square 4836
B3 Round 4836
B3 Square 6032
B3 Round 6032
B3 Square 6036
B3 Round 6036
2.3
Check me!
Shims and
Shims and cement
cement under
Cales et ciment
to level B3
Cuñas y cemento
2.4
Check me!
2.5
Check me!
3/8" (8 mm)
Ø 1/8"
9
No.
420001-5XX
410001-5XX
420003-5XX
410003-5XX
410005-5XX
410005-5XX
410006-5XX
410006-5XX
13
bases
13
13

Publicidad

Tabla de contenido
loading

Tabla de contenido