VTrak Task List
Step 1: Unpacking the VTrak (below).
Step 2: Mounting VTrak in a Rack
•
•
Step 1: Unpacking the VTrak
The VTrak J610s or J310s box contains the following items:
•
VTrak J610s or J310s Unit
•
Quick Start Guide
•
Front bezel and key (J310s only)
•
RJ11-to-DB9 serial data cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)
•
1.0m (3.3 ft)SFF-8088 4X to 4X
external SAS cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)
The electronic components within the VTrak are sensitive to
damage from Electro-Static Discharge (ESD). Observe
appropriate precautions at all times when handling the VTrak or its
subassemblies.
•
Screws for disk drives
(J610s: 70, including 6 spares)
(J310s: 50, including 2 spares)
•
Left and right mounting rails
•
Left and right center-mount brackets
•
1.5m (4.9 ft) Power cords (2)
CD with Product Manual and Quick
•
Start Guide
Warning
3
Step 1: Unpacking the VTrak