Ingeteam
5 Final check
This chapter describes the instructions to check that all the connections and settings have been
successfully done.
1) Make sure that the CAN communication wire from the BYD battery to the inverter is
connected.
2) Make sure that the battery circuit breaker is in ON position.
3) Make sure that the inverter is turn-on from the battery and doesn't show communication
Error with BMS.
ABH2010IMC19_
Use and settings of the INGECON SUN STORAGE 1Play TL M working with BYD B-BOX
Premium HVS/HVM
25