HYDRAULIC CONNECTION
Fit the supporting hooks and attach the assembly template, moving it up to the wall; fit all the pipes, starting
with the end pipe fittings already mounted on the template: system supply, system return, cold water, hot water,
any gas pipes and electric mains leads with room thermostat.
Once the pipes have been fitted, the end pipe fittings can be removed and ordinary caps fitted, ready for
hydraulic tests to be carried out. The template can be removed or, if left in place, will be embedded in the wall
once finishing operations have been completed (plaster and tiles); only the two supporting hooks will protrude
from the wall, as well as an opening for the connections. Attach the boiler to the hooks through the holes at the
back of the frame, push it up against the finished wall and fit the two lock nuts onto the hooks.
Make the necessary hydraulic connections using the pipes/tubes supplied, cutting them to the right length,
depending on the distance between the fittings on the boiler and those on the template embedded in the wall.
LEGEND
Hot water Ø 1/2"
C
G Gas Ø 3/4" (see cock supplied
with the boiler)
Boiler water supply Ø 1/2"
F
(cold)
AE Electrical supply
M Installation delivery Ø 3/4"
Installation return Ø 3/4"
R
GS Holding hooks Ø10 mm.
NOTE: Preview hydraulic female
connections.
56