DUAL CAM HP ASSEMBLED
Equipment Required:
Fastener Kit: 100126
Wrenches: 1-1/2" Open End, ¾" Open End
½" Open End, ¾" Socket & Ratchet
Drill Bits: 7/16", 17/32" & Center Drill (Pilot Drill)
Other: 8 – 10" C-Clamp, Tape Measure, Light Penetrant Oil
Figure 1
STEEL trailer frames only. Not for use
with aluminum frames.
Qty. (2)
Dual Cam HP Cam Arm Assembly
Hanger Bracket – Snap up Bracket
Qty. (2)
½ - 13 Thread Forming Screw (Optional use with
Qty. (2)
snap up Bracket. Not Shown Here.)
½-13 X 3 ½" Square Head Bolt
Qty. (2)
Qty. (6)
½-13 Hex Nut
½" Lock Washer
Qty. (4)
½-13 X 1 ½" Grade 5 Bolt
Qty. (4)
Rivet Nuts
Qty. (4)
For Installation or Operation Support contact CPP Technical Service: 1-800-632-3290
Failure to follow all of these instructions may result in death or serious injury!
©
2014 , 2017 HORIZON GLOBAL
Installation Instructions
REESE Dual Cam HP
High-Performance Sway Control
2
WARNING:
Sheet 1 of 33
DEALER/INSTALLER:
(1) Provide this Manual to end user
END USER:
(1) Read and follow this Manual every time you use Dual Cam HP.
(2) Save this Manual for Future Reference.
(3) Pass on copies of Manual to any other users or owner.
Do Not Exceed Lower of Towing Vehicle Manufacturer's Rating, or
Trailer Manufacturer's Rating
8
1
6&7
5
4
26002IN
Part Numbers:
26002
Figure 2
Inside View of Trailer
Frame
5/31/17
Rev. T