Descargar Imprimir esta página

Draw-Tite 4494 Instrucciones De Instalación página 6

Kit de montaje de cuello de ganso, ford super duty f-250/f-350/ f-450

Publicidad

Idiomas disponibles

Idiomas disponibles

FASTENER TORQUE SEQUENCE - FIGURES 7 & 8
1.
Torque all fasteners in the following order- Figure 7
1.
Torque Center Section Carriage Bolts (4) 5/8-11 x 2.00 GR.8 Carriage Bolts to 212FT-LBS (1)
2.
Torque Center Section Hex Bolts (7) 5/8-11 x 2.00 GR.8 Hex Head Bolts to 212 FT-LBS (2)
3.
Torque Rail Hex Bolts (8) 5/8-11 x 1.50 GR.8 Hex Head Bolts to 150 FT-LBS (3)
4.
Torque Mounting Bracket Bolts (4) 5/8-11 x 4.250 GR.8 Hex Head Bolts to 212 FT-LBS (4)
VEHICLE FORWARD
VEHICLE FORWARD
REPLACE ALL TRUCK EQUIPMENT REMOVED OR LOWERED
1.
2.
3.
©
2017 Horizon Global
RAISE EXHAUST SYSTEM BACK IN TO POSITION, REPLACE AND TIGHTEN ANY
BOLTS REMOVED OR LOOSENED PREVIOUSLY.
RAISE THE BRAKE & ELECTRICAL HANGER BACK INTO POSITION AND REPLACE
AND TIGHTEN ANY BOLTS REMOVED OR LOOSENED PREVIOUSLY.
RAISE THE SPARE TIRE BACK INTO POSITION.
4494N
Page 6 of 18
FIGURE 7
FIGURE 8
9/25/17
Rev. A

Publicidad

loading