Installation
Connecting the PDU
2-1
Plug the PDU into a Compatible
Electrical Outlet: (120V L5-30R
for Model PDUMH30NET;
208/230V L6-30R for Models
PDUMH30HVNET &
PDUMH30HV19NET; IEC 309 2P
+ E for Model PDUMH32HVNET).
2-2
Connect Equipment to the PDU's
Output Receptacles: Plug
equipment into the NEMA
5-15/20R (Model PDUMH30NET),
IEC 60320 C13 (Models
PDUMH30HVNET &
PDUMH32HVNET) or IEC 60320
C13 & C19 (Model
PDUMH30HV19NET) output
receptacles of the PDU. The LED
near each output receptacle will
illuminate when the receptacle is
ready to distribute live AC power.
The digital load meter
set with the switch
amps the PDU's total connected
load (all outlets), or the load
carried by either the upper or lower
bank of outlet receptacles. When
the total connected load display is
selected, both of the green LEDs to
the right of the display
illuminate. When the top bank
display is selected, only the top
LED will illuminate; when the
bottom bank display is selected,
only the bottom LED will illuminate.
2-3
Cord Retention (Optional): If you
attached the cord retention shelves
(STEP
), use them to secure
1-3
equipment power cords. Attach
each cord to the retention shelf by
looping the cord and securing it to
an attachment point with one of
the included cable ties. Make sure
that each equipment power cord
can be unplugged from the PDU
without removing the cable tie.
18-11-324-933686.indb 4
2-1
2-2
A
may be
B
to display in
C
2-2
will
D
2-2
2-3
4
Your model may vary.
B
D
A
C
C
B
D
A
C
B
D A
1/25/2019 3:24:37 PM