PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and diagram above. If any part is missing or damaged, do not attempt to
assemble, install or operate the product. Contact customer service for replacement parts.
Estimated Assembly Time: 60 Minutes
Tools Required for Assembly (not included): Phillips head screwdriver, scissors and utility knife
ASSEMBLY INSTRUCTIONS
1. Locate the Center Front Panel (D), Center Right
Side Panel (C) and Center Left Side Panel (B) and
set out face down on the scratch free surface.
Attention: Front Panels with Stone are very
heavy. Please handle with care. Requires two
people to lift and hold in place. Hand tighten
bolts only until assembly is completed.
Insert one Wood Dowel (CC) into each of the
pre-drilled holes.
Push the Center Right Side Panel and Center Left
Side Panel snug to the Center Panel. Make sure the
Wood Dowels are seated in the pre-drilled holes.
Insert Bolt (AA) and Washer (BB) into the holes in
the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
2. Locate Hearth/Base (A) and set out fi nished side up
on the fl oor.
Insert one Wood Dowel (CC) into each of the
pre-drilled holes.
Attach the Completed assembly from step 1 to the
Hearth/Base (A). Make sure the dowels are seated
into the pre-drilled holes in the Hearth/Base. Using
Bolts (AA) and Washers (BB) attach panels through
the pre-drilled holes in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
Fig. 1
x 2
x 2
Fig. 2
x 4
x 4
x 4
x 4
4
D
CC
BB
AA
C
AA
BB
A
CC
B