(8) Drainage pipes should have a downward slope of at least 1%~2%, in order to prevent pipes
from sagging; install hanger bracket at intervals of 1000~1500mm.
(9) Prepare the local piping at the connection point for the drainage pipe, as shown in Fig 4.3.2.6.
4.3.3 Test of Drainage System
(1) Please test drainage system after electric work is finished.
Inject approximately 1L purified water to drain pan from air vent; pay attention not to splash the
water over the electrical components (e.g. water pump. etc.):
(2) During the test, please carefully check the drainage joint and make sure no any leakage
occur.
(3) It's strongly recommended to do the drain test before ceiling decoration.