Ingeteam
5 Final check
This chapter describes the instructions to check that all the connections and settings have been
successfully done.
1) Make sure that the CAN communication wire from the PYLONTECH battery to the
inverter is connected.
2) Make sure that the battery circuit breaker is in ON position.
3) Make sure that the inverter is turn-on from the battery and doesn't show communication
Error with BMS.
ABH2010IMC20_
Use and settings of the INGECON SUN STORAGE 1Play TL M working with
PYLONTECH US2000/US3000/FORCE-L1/FORCE-L2
21