Heathrow Scientific vortexer Manual De Instrucciones página 9

Ocultar thumbs Ver también para vortexer:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

E. Loading of 5 mL tubes
(maximum of 2)
F. Loading of 1.5/2 mL tubes
(maximum of 4)
G. Loading of .5 mL tubes
(maximum of 6)
H. Loading of .2 mL tubes
(2 tube strips - maximum of 24)
Vortexer head removal
In the event of a cleaning being needed for
the Vortexer, please follow the sequence of
removal for the mixing head.
Turn the power OFF by placing the 3-position
switch into the OFF (center) position.
Grasp the installed mixing head attachment
with two hands and pull straight up until it
releases from the shaft. A technique of lifting the
attachment with your finger tips while using your
knuckles as a fulcrum will give you the leverage
to remove the installed attachment component
smoothly. Once Vortexer is cleaned, reinstall the
mixing head per instructions.
e
f
g
h
place
switch in
the OFF
position
pull
straight
up
9

Publicidad

Tabla de contenido
loading

Tabla de contenido