Quick Start Guide
ASSEMBLY
Sample Pan
Pan Handle
Pan Support
Draft Shield
Tray Pan
MAKING A SIMPLE MEASUREMENT
Use one of the included absorbent glass fiber pads as a sample to become familiar with the instrument and the
various displays.
Ohaus Corporation www.ohaus.com
CONTROLS
Leveling
Indicator
Leveling
Leveling
Feet
Feet
If the display is not visible and the unit is plugged into a power source, press
the On/Off button.
Directly start a measurement.
Open the cover on the Moisture Analyzer.
Clean the pan.
Place the pan handler in the sample chamber. Ensure that the tongue of the
pan handler fits exactly in the slot of the draft shield element.
Place the empty sample pan and glass fiber pan in the pan handler. The
sample pan must lie flat in the pan handler.
Note: It is advisable for you to work with the pan handler at all times. The pan
handler is ergonomic, safe and provides protection against possible burns due
to a hot sample pan.
Close the cover. This sets the Moisture Analyzer to zero automatically.
Open the cover on the Moisture Analyzer.
Wet the glass fiber pan with a 0.5 to 1 gram of water.
Note: Minimum sample size must be greater than 0.5 gram.
Starting the test
Close the cover, the Moisture Analyzer starts the drying and measurement
process automatically.
i
MB90/MB120
Turns On or Off display and fan.
When pressed, sends Print command.
When pressed, either starts or stops the
drying process.
When pressed, performs Tare function.
Leveling indicator
Used to level the Moisture Analyzer.
MB90/120 Moisture Analyzers Quick Start Guide