MB90/MB120
MB90/120 Moisture Analyzers Quick Start Guide
Drying and measurement
You are now able to follow the progress of the drying cycle on the display.
This first display comes up automatically when the test was started.
Observing the test progress
There are two displays available when the Moisture Analyzer is running a test.
One showing the %MC value and another showing a curve.
When pressing the data area while %MC is shown, the display will switch to
show the curve. Likewise, pressing the data area again will switch back to
show the %MC value.
The display indicates the Method Name, Temperature/Time, actual
temperature, elapsed time duration of the test, moisture and curve.
The test automatically stops at the end of the measurement.
If you want to end the test sooner, press the
Congratulations! You have just performed your first measurement with your
moisture analyzer.
Carefully remove the sample pan handler from the drying area.
WARNING: As the pan and sample may still be hot, you should let these
cool down before removing the pan from the pan handler!
Edit default method
The analyzer comes with a default method preinstalled. The settings of the
default method are shown on the display. To edit the settings, press on the
area where the settings are displayed as shown to the left.
Press the setting items to edit them.
Please see the instruction manual for more details.
For the full instruction manual, please scan the QR code below:
MB120 Instruction Manual:
ii
Quick Start Guide
button.
MB90 Instruction Manual:
Ohaus Corporation www.ohaus.com