Description Of Display; Set-Up - Cebora WIN TIG AC-DC 270T Guía Rápida De Instalación Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42
6.3

Description of display

WinTIG line power sources are equipped with a 7" LCD display (A) Fig. 1 and resistive touchscreen that can be used even when wearing welding
gloves.
S
R
Q
P
O
7

SET-UP

The standard version includes the following system components:
- power source
- torch for manual/automatic TIG welding
- cooling unit, check that the fluid level is between Min and Max on reservoir T(*).
- pressure regulator
- gas cylinder.
Step 1
Connect the pressure regulator to the inert gas cylinder. The gas nozzle diameter in mm corresponds to the gas flow in l/min to be
set on the regulator.
Step 2
Connect the gas pipe to the H fitting
Step 3
Connect the power supply plug to the electrical panel, check that the voltages and fuses are compatible with those specified in the
technical data table.
Step 4
Connect the torch to connector D and any cooling pipes to the cooling unit, if present. Connect torch control connector P and also
connect the earth to connector
Step 5
Turn on the power source by setting the mains switch to position 1.
Step 6
When the power source has started up and the main screen has appeared, enable the cooling unit if necessary (see instruction
manual 3301062).
Step 7
Run the gas test if necessary
Step 8
The power source is ready for use. For details of processes and machine settings, refer to manual 3301062.
18/21
T
I
Z
M
N
V
C.
During start-up, for 5 seconds the display presents all the information regarding the
machine, the serial number, the software version, when the software was updated,
the options installed and the IP address.
The display then presents the main screen (factory setting).
S
Main screen status bar
R
Main welding parameter settings menu
Q
Selection of welding process type TIG DC, TIG DC APC, TIG XP,
TIG AC, MIX AC, MMA, MMA AC Plasma Welding, TIG Cold Wire.
P
Selection of start type, two stroke, four stroke, three level, four level.
O
Selection of ignition type, HF, Lift, Evo Lift.
N
Selection of DC pulse parameters, duty cycle frequency, second
current level.
V
Selection of AC process, frequency, horizontal balancing, vertical
balancing, penetration waveform type and cleaning parameters.
M
Main menu for machine process setup, process parameters,
accessories and settings.
Z
MIX AC process parameter settings menu.
I
JOB management menu
T
Gas test and motor speed menu
3301229

Publicidad

Tabla de contenido
loading

Tabla de contenido