Drain Test; Panel Installation - McQuay B-Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 61

Drain Test

Feed Water
Flexible
Drain Hose

Panel Installation

Good Installation
Main Drain Pipe
OPEN
Screw
Indoor unit
cool
air
ceiling board
Panel
Connect the main drain pipe to the flexible drain hose.
Feed water from flexible drain hose to check the piping
for leakage.
When the test is completed, connect the flexible drain hose
to the drain connector on the indoor unit.
NOTE
This indoor unit uses a drain pump for condensed water
drainage. Install the unit horizontally to prevent water
leakage or condensation around the air outlet.
Be sure to remove the installation template before installing
the front panel.
Open the air intake grille by pull back the catchers and
remove it together with filter from panel.
Install the front frame panel onto the indoor unit by 4
screws and tighten it completely to prevent cool air
leakage.
Connect the LED wire to the indoor unit.
LED Wire
From Front Panel
NOTE
Install the front frame panel firmly to prevent cool air
leakage which will cause condensation and water dripping.
air leak
Bad Installation
1-5
Control Box
cool
air
air leak
ceiling board
Panel

Publicidad

Tabla de contenido
loading

Tabla de contenido