Fax +32 2 359 95 50
#
INSTALLATION PROCEDURE
How to install the lid on the cooking bowl
1.
Place the lid on the bowl and gently turn the lid to align with the handle.
2.
Close the opening of the lid with the cap (D).
How to install or release the cooking bowl
Install the cooking bowl
1. Install the bowl on the base of the unit and make sure that the Z1 indication is aligned with
the Z2 indication and the handle of the unit with the eject button. The bowl is properly
installed when you hear a "click".
2. If the code E01 disappears on the display, it means that the cover has been inserted
correctly.
Release the cooking bowl
1. Press the button "Take off", indicated by an arrow.
2. Remove the cooking recipient from the base of the appliance.
How to install the cooking tools : stir blade/ kneading dough / stirring hook / butterfly stick
1. Install the tool holder in the bowl. (Caution: the lever must be in the open position
2. Rotate the lever to the locked position
3. Place the selected item on the holder and rotate it slightly to the left to secure it to the
bottom of the bowl. The installation is complete.
Copies of the I/B. Please reproduce them without any
changes except under special instruction from Team
International BELGIUM. The pages must be reproduced
and folded in order to obtain a booklet A5 (+/- 148.5 mm
width x 210 mm height). When folding, make sure you keep
the good numbering when you turn the pages of the I/B.
Don't change the page numbering. Keep the language
integrity.
to lock the tool holder.
11
11
77
Assembly page
/
).
.
3