When planing on one side, the stopper must be
swivelled out so that there is some clearance
between the plane and the empty tension device. The
tension device and the plane cannot touch each
other in this way.
Switch on the electric plane by pressing the start
4
button. Hold down the start button while planing.
Release the start button to stop planing.
5
Swing the electric plane out.
6
Check the cut surfaces by bringing together the parts
7
to be welded.
Welding the pipes or fittings
CAUTION
Risk of injury from burns
Do not touch the welding plate during operation or
during the cooling-down phase
Connect the welding plate to the power supply
1
system.
Wait until the welding temperature has been reached.
2
KSS 160 and KSS 200:
The red signal lamp lights up during the heat-up
phase. The green signal lamp lights up when the
welding temperature has been reached.
KSS 160
KSS 200
00:08:00
It takes around 8–10 minutes to reach the welding
temperature.
Swivel the welding plate with the welding plate
3
support between the parts to be welded.
Press the operating lever to the right to lightly press
4
the pipes onto the welding plate on both sides: The
cut surfaces start to melt.
Operation
DE
EN
FR
IT
NL
ES
PT
DK
NO
SE
FI
IS
PL
HU
SK
CZ
SL
HR
SR
TY P
84
ME DIA
.
H. NR
MA SC
EE
LV
LT
BG
RO
GR
TR
RU
TY P
84
AE
ME DIA
.
H. NR
MA SC
CN
JP
25