Descargar Imprimir esta página

AMG CANADIAN IDRO 17 Manual Del Usuario página 77

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 145
Preliminary checks
Before switching on the machine, make sure that the pellet hopper is full, the combustion chamber
is clean, the glass door is closed, the power supply plug is connected and the switch on the back
is set to "1."
Information on the display
TURNED OFF
21 : 10
The machine is off.
22°C
P-1
TURNED OFF
TURNED ON
14 : 35
The machine is in the rst
21°C
P-2
ignition phase. The glow
TURNED ON
plug and fume extractor are
active.
LOAD PELLET
14 : 35
In this phase of the ignition
21°C
P-2
process the machine starts
LOAD
loading the pellets into
pellet
the brazier. The glow plug,
the fume extractor and the
cochlea engine are active.
FIRE PRESENT
14 : 35
In this phase of the ignition
22°C
P-1
process the machine starts
FIRE
loading the pellets into the
present
brazier. The fume extractor
and the cochlea engine are
active.
WORK
15 : 18
The machine is working, in
22°C
P-3
this case at power 3. The
WORK
detected room temperature
is 21 ° C. During normal
work, the fumes fan, the
auger motor and the room
fan are active.
BRAZIER CLEANING
15 : 18
The machine is cleaning
22°C
p-2
the basket. The smoke
BRAZIER
extractor runs at maximum
CLEANING
speed and the pellet load is
at minimum.
OK STAND BY
21 : 10
All the requests have been
22°C
P-1
satis ed and the machine is
stand by
ready for the "STAND BY"
mode.
HOLD REQUEST
14 : 35
The machine is in a "STAND
21°C
P-2
BY" mode as everything has
HOLD
been satis ed and is waiting
REQUEST
for an heating request to
turn on.
WAIT COOLING
14 : 35
The
machine
21°C
P-2
complete the cooling cicle
WAIT
before turning on again.
COOLING
has
to
29

Publicidad

loading

Productos relacionados para AMG CANADIAN IDRO 17

Este manual también es adecuado para:

Elipse th17