Sime MURELLE HE 25 BF Manual De Instrucciones página 91

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4
DISASSEMBLING THE SHELL
To simplify maintenance operations on the
boiler, it is also possible to completely remo-
ve the shell, as shown in Figure 19. Turn the
control panel to move it forward and be
able to access the internal components of
the boiler.
Codice/Code 8106300
Modello/Model MURELLE HE 25 BF
Matricola/Serial n. 9999999999
PAR 1 = 3 (G20) / 9 (G31)
PAR 2 = 1
4.5
MAINTENANCE
To guarantee functioning and efficiency of
the appliance, in respect of the legal provi-
sions in force, it must be regularly checked;
the frequency of the checks depends on
the type of appliance and the installation
and usage conditions.
ATTENTION
Before removing or refitting the front
panel of the boiler, open the small
upper plastic door.
In any case, it should be inspected at least
once a year by a qualified technician.
During maintenance operations, it is
important to verify that the drip-plate
with drain trap contains water (this
check is particularly important if the
generator has not been used for exten-
ded periods of time).
ES
PT
GB
Fig. 19
91

Publicidad

Tabla de contenido
loading

Tabla de contenido