ENGLISH
- J4C 20 TO 300 INSTALLATION INSTRUCTIONS
6. BSR - NC/NO SET-UP
Set up by using the SELDIR Jumper (Fig.9): NC: jumper on / NO: jumper off.
J4C 20 to 85
Fig. 9
7. DPS
Place the DIPS (Fig. 10) according to the signal you need to work with.
External adjustment
B
(Fig. 11).
A. plug - Connect voltage to the actuator in the following way:
VAC: PIN1 (neutral) and PIN2 (phase).
INDEX
NO (Normally Open) or NC (Normally Close).
Jumper SELDIR
BSR plug-in failsafe system,
J4C 140 to 300
Fig. 9
Jumper SELDIR
Fig.10
07