Installation
2. Installation
Installation, initial operation and maintenance of this appliance must only be con-
ducted by an authorised professional, who will then be responsible for adherence to
applicable standards and installation regulations. We assume no liability for any damag-
es caused by failure to observe these instructions!
2.1 Typical installation: vented (open) installation
Electrical connection with
mains power cable
(shorten if necessary)
Fig. 3: "Vented installation with a special open-outlet tap" (dimensions in mm)
Insert the special tap aerator:
3,5 / 4,4 kW: CSP 3
5,7 / 6,5 kW: CSP 6
Angle valve outlet G ⅜"
19
CLAGE
EN