Prepare The Site - Kohler K–15708 Guia De Instalacion

Ocultar thumbs Ver también para K–15708:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1-1/2" (3.8 cm) D.
1-1/4" (3.2 cm) D.
Hole
1/4" to 2-1/8"
Max. Rim or
Deck Mount
1-1/8" D.
5/8" OD
8" (20.3 cm) Min.
Rim or Deck Mount
Installation
Rough + Finished Deck
Mount Installation

1. Prepare the Site

X = the distance from the centerline of the spout inlet base to the
front of the spout base plus 1/2" (2.5 cm).
Install or relocate the water supplies as needed.
The distance between the valve centerlines may vary. Installation
instructions are given for an 8" (20.3 cm) dimension.
Protect the surfaces of the bath/deck during installation.
Ensure that holes drilled into the deck are not oversized. The
spout and valves require adequate base material strength and
maximum contact area with the deck.
NOTE: Reinforcing material may be required if the deck or rim is
thin. Install 1/2" exterior grade plywood before proceeding.
NOTE: For installations to be covered with tile, the tile thickness
must not exceed 1-1/4" (3.2 cm).
For installations with 8" (20.3 cm) centers using copper tubing
(1/2" nominal, 5/8" OD), cut two 2-7/8" (7.3 cm) pieces.
The diameter of the spout hole should be 1" (2.5 cm) maximum.
114183-2-CB
1" (2.5 cm) D. Hole
7/8" D.
1/4" to 1-1/4" Max.
Finished Deck
2-1/8" Max.
Rough Deck
5/8" ID
K-T15880, K-T15881
X
2" D.
Spout
Escutcheon
3/16" D.
Anti-twist
Screw Hole
4
1" D.
Spout Hole
3/4"
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido