GB
5. Design / Delivery
6. Installation
1. Screw the foot clockwise to the sleeve.
2. Then screw the shell clockwise to the socket body.
3. The earth spike is ready.
Use position:
8
Socket body with power cord
Shell
Foot
Insert and operate device only in an upright
position! Ensure a sufficient stability of the
product in the ground!