Hanging The Tubes - L.B.White Oval-U 100 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12
Oval-U 100
Hanging the Tubes/Shroud Assembly
and Burner Box
The tubes/shrouds and burner box come from the fac-
tory fully assembled. Before taking the tube assembly
out of the box, complete the following steps. See FIG. 4.
1. Rotate the burner box 90°
2. Ensure the burner box tube is completely inserted
into adjoining tube.
3. Center the clamp over the tube connection.
4. Tighten the clamp bolts evenly to 65 ft.-lbs.
5. Attached the S-hooks to the shroud supports.
6. Attached the chains to the burner box eyebolts and
to the shrouds S-hooks.
FIG. 4
Eyebolts
Owner's Manual • Oval-U 100
shown in Fig. 6. Aligning to the center of the burner
box discharge, hang chains at these points, using
open eye hooks.
Radiant Tube Heaters
FIG. 6
Hanging Chains
S-Hooks
10
Radiant Tube Heaters
7. Install eyebolts to ceiling joist, See Fig. 5 for distance
reference between eyebolts.
FIG. 5
BURNER BOX
BURNER BOX
A
B
C
HANGING CHAIN DISTANCES
A-B
1 ft.
TRUSS
HEATER
B-C
10 ft.
CENTERS
LENGTH
20 FOOT
4 FOOT
50 FOOT
* Support must be created between the truss
20 FOOT
5 FOOT
50 FOOT
8. Using a winch system, lift the tube heater assembly and
20 FOOT
50 FOOT
10 FOOT
connect the chains to the ceiling eyebolts.
* A SUPPORT MUST BE CREATED BETWEEN THE TRUSS
9. Using a leveler, ensure the tube/shroud assembly is
level. See Fig. 6.
OPEN EYE BOLT
BURNER
DISCHARGE
HANGING CHAINS
HANGING CHA
C
D
E
F
A - B B - C C - D D - E
(FT)
(FT)
(FT)
(FT)
4
4
4
8
4
4
12
8
5
5
5
5
5
5
10
10
5*
5*
5
5
5
5
10
10
*
11 IN.
1 FT

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ut100

Tabla de contenido