7
COMMISSIONING
10
1.
Alignment of the light band in the gap between two conveyor belts
2.
a) Alignment of the light band above the conveyor belt.
The light band has to be positioned parallel to the conveyor belt.
3 mm
b)
Take a metal plate and position it in front of the reflector. Rotate the sensor up a lit‐
tle. The light band is approx. 20 mm above the conveyor belt.
c)
Rotate the sensor down a little until the lower edge of the light band will hit the con‐
veyor belt (see light band on metal plate). Then fix the housing at the bracket. The
light band may not be moved further into the conveyor.
1
1 = metal plate
8022178.168D | SICK
Subject to change without notice