Erreka VULCAN Manual Del Instalador página 66

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

INSTALLATION
Connect the operator to the switchboard
CLOSE OPEN
P1 P2 P3
P4 P5 P6
P15 P14 P16
ST1
FT1
ST2
FT2
FCA1
FCC1
1
Motor connection (common)
2
Motor connection (turning 1)
3
Motor connection (turning 2)
4
Earth
Position the end cap and tighten the gland
62
Installation manual
All manuals and user guides at all-guides.com
G1
G2
G3
P7 P8
P11 P12
P22 P23
G7 G8
G9 G10
Courtesy
LOCK
24Vac
Lamp.
MOTOR1 (G2-G1-COM)
STOP
Light
VIVO- M101:
230Vac/ 50Hz
VIVO- M101M:
125Vac/ 60Hz
Before making any electrical connections,
check the switchboard instructions manual.
We recommend using the VIVO-M101(M) or VIVO-
M201(M) switchboards.
1 Connect the operator to the switchboard.
2 Connect the capacitor (C) in cable connectors Turn
1 and Turn 2.
3 Connect the closing (FCC) and opening (FCA) limit
switch.
4 Connect the switchboard to the electricity supply.
N
L
POWER
5 Activate the power supply switch.
Before carrying out any gate movement,
ensure there is no person or object in the radius
N L
of action of the gate and the drive mechanisms.
6 Use the switchboard mini-pushbuttons (CLOSE-
OPEN) to check the motor connections are correct
(turning direction).
P140W
If
the
interchange the cables 2 and 3.
Ensure the earth cable is properly connected.
1 Position the end cap (1) in its housing (2) and attach
using the screws (3).
2 Tighten the gland (4) to ensure the electrical cable
input (5) is seal tight.
turning
direction
is
not
correct,

Publicidad

Tabla de contenido
loading

Tabla de contenido