Erreka VULCAN Manual Del Instalador página 65

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Loosen the discharge screw
Mount the gland and introduce the cable
All manuals and user guides at all-guides.com
1 Introduce the cable (3) through the gland PG11 (1).
2 Position the gland in the end cap (4) and attach
3 Crimp the Faston connectors in the electrical cables
CAUTION. VERY IMPORTANT:
1 Once the operator is mounted on the
supports, turn the discharge screw (1) once
to allow the correct operation of the
hydraulic system.
O
If you have to dismount the operator from
its supports, first tighten the discharge screw
in order to prevent the hydraulic fluid from
leaking.
using the nut PG11 (2).
(5).
INSTALLATION
VULCAN hydraulic operator
61

Publicidad

Tabla de contenido
loading

Tabla de contenido