During the installation phase it is necessary to carry out the following operation to
fill the boiler.
1) Power the machine by means of the general switch placed on the wall.
The machine will display the loaded software version and then some hyphens
will be displayed (see figure below).
2) Switch on the machine by pressing the line push-button "A"; the machine
begins loading water. Wait for the water to come out of the rinse arms.
Warning: if the tank door is open the machine does not load, thus check it
looking from the machine baskets exit.
3) Now the boiler is loaded, and the boiler quick heating can be activated.
Switch off the machine, open one of its doors, and press contemporarily push-
buttons G and L for a few seconds until the wording "PH"; "ON" is displayed.
2.7
Fit the limit switch (located on the machine side panel) on the outlet
table

CONNECTION TO THE LIMIT SWITCH

2.8

START-UP (BOILER LOADING)