ASSEMBLY INSTRUCTIONS KIT DPS 20/85
ENGLISH
-
PLEASE READ CAREFULLY BEFORE MOUNTING.
VERY IMPORTANT!!!! PLEASE FOLLOW THE INSTRUCTIONS STEP BY STEP. BEFORE CONNECTING "A"
PLUG TO THE ACTUATOR,
CHECK THAT THE VOLTAGE IS THE SAME AS THE ONE SPECIFIED ON THE LABEL (CARTER).
TO CONVERT A STANDARD (ON-OFF) J4C ELECTRIC ACTUATOR INTO A MODULATING FUNCTION WITH
POSITIONER, PROCEED AS FOLLOWS:
The unit must be disconnected from any electrical power or signal before installing.
1. Remove the screw, which is fixing the hand wheel. (Fig. 2)
2. Remove the 6 screws, which are fixing the body to the cover of the actuator (Fig. 3).
3. Carefully lift the cover (Fig. 4).
4. Remove the cables (from the cover) connected to the actuator PCB (Fig. 5A, 5B and 5C).
5. Carefully remove the position indicator (Fig. 6).
6. Fix the plastic column (B) on the base plate, by using 2 sheet metal fixing screws (D) (Fig. 7A, 7B and 7C).
7. Take the DPS cover (A) and connect its cables, following (Fig. 8A, 8B and 8C).
8. Place the mentioned cables as per (Fig. 9A and 9B).
9. Mount the DPS positioner PCB (C), matching the cleft of the shaft with the key inside the DPS gear (Fig. 10).
10. Press the DPS positioner PCB (C) along the shaft until the PCB connector (JP3) is plugged in the actuator
PCB connector (JP2) (Fig. 11).
11. Fix the DPS positioner PCB (C) to the plastic column (B) with the plastic fixing screw (E) (Fig. 12A).
12. Connect the remaining cable (A) to the connector base on the DPS PCB (C) (Fig. 12B).
13. Carefully insert the position indicator, matching its inner key with the cleft of the shaft (Fig. 13).
14. In order to set the actuator up, use the DIPs shown in picture (Fig. 14). Put DIP 1 in ON position, connect
the grey connector to the power supply, put DIP 1 back to the prior position. Wait until the actuator make
a complete maneuver (Fig. 14A and 14B).
15. Disconnect the grey connector from the power supply.
DPS 20/85
03