Kohler K-702300 Guia De Instalacion página 7

Puerta de ducha neo-angular
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bridge Member
(Outside Area)
Strike Post
Bridge Member (Outside Area)
Inside Area
Toward Shower
Strike Post
Bridge Member
6. Assemble the Door Framework
Lay the shower door framework down in an open area with the outside of the door framework
facing up and the beveled side of the bridge members facing in.
Attach the flange and strike post to the bridge members with #8 x 1" pilot point screws.
7. Determine the Door Swing
Determine whether the door will pivot to the right or left. Check that there are no obstacles in the
door's path as it swings open.
Kohler Co.
Flange
Bridge Member
100˚ Swing
Inside Area
Toward Shower
Flange
Flange
7
Top View Pivot
Side Left
100˚ Swing
Top View Pivot
Side Right
No. 8 x 1" Pilot
Point Screw
1032629-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido