16
Instructions for Use
Use Procedure
Use Procedure
Controller Setup
To startup the controller plug the power cable into a suitable power
source.
Starting the Pump
To start the pump send the START command to related pins of the
input connector (pin 1 - 6 of P1 connector), or, when the hand held
terminal is available, press the START pushbutton.
Pump Shutdown
To shutdown the pump remove the START command from the related
pins of the input connector (pin 1 - 6 of P1 connector), or, when the
hand held terminal is available, press the STOP pushbutton.
Maintenance
The Turbo-V 1000HT PCB series controller does not require any
maintenance. Any work performed on the controller must be carried
out by authorized personnel.
When a fault has occurred it is possible to use the Agilent repair
service. Replacement controllers are available on an advance
exchange basis through Agilent.
WARNING!
Before carrying out any work on the controller, disconnect it from the supply.
200/262
Turbo-V 1000HT PCB Controller User Manual / 87-900-906-01
(F)