All manuals and user guides at all-guides.com
Behaviour upon the failure and resetting of the BUS power supply
If power fails on the BUS, the device will not carry out any action. When the power supply
resumes, the timed thermostat will reactivate the conditions that were in place prior to
the power failure.
The timed thermostat has a buffer battery, so the date and time are maintained even
when there is a BUS voltage failure (battery lifespan > 2 years).
If the front is connected to the fixed part, the behaviour of the relay (with the drop and
subsequent resetting of the BUS power supply) will be determined by the parameters
set during the ETS configuration phase; if, on the other hand, the front is detached from
the fixed part, the relay will remain in the condition it was in before being removed.
The device does not require any maintenance. Use a dry cloth if cleaning is required.
Detailed information about how to set the timed thermostat parameters is given in the
Programming Manual (www.gewiss.com).
The device must be configured with the ETS software. Detailed information about the
configuration parameters and their values is given in the Technical Manual
(www.gewiss.com).
USER INSTRUCTIONS
Maintenance
Setting the parameters
Programming with ETS
24